(A) Utilities. Easements 12 feet in width may be required between, at the rear, or in front of lots, whenever necessary. Easement of greater width may be required if necessary for the extension of water and sewer lines or other utilities.
(B) Storm water drainage easement. Storm water easements or drainage rights-of-way may be required by the Planning Commission if necessary for proper drainage within or through a subdivision.
(C) Connection to existing easements. When necessary, utility and drainage easements shall connect with existing easements on adjoining property.
(Ord. passed 10- -1977; Ord. passed 1-6-1998; Ord. passed 11-12-2001)