(a) Building Lines. Building lines shall be established according to the front yard requirements set forth in the Village Zoning Ordinance.
(b) Easements. Easements of at least seven and one-half feet in width shall be provided on each side of all rear lot lines and along side lot lines, where necessary, for underground utilities such as electric, telephone service and gas mains. Easements having greater width dimensions may also be required along or across lots where engineering design or special conditions may necessitate the installation of water and sewer lines outside public rights-of-way. For lots facing on curvilinear streets, the rear easement should consist of straight lines with a minimum number of points of deflection.
(c) Easement Along Streams. Whenever any stream or important surface drainage course is located in the area being subdivided, the subdivider shall provide an easement of at least forty feet in width, or such width as may be determined by the Planning Commission and Village Engineer along each side of the stream for the purpose of widening, deepening, relocation or protecting the stream drainage or public use.
(Ord. 2477-97. Passed 7-16-97.)