A water distribution system shall be designed and constructed by the subdivider to provide adequate water service for all lots in the proposed subdivision. A subdivision plat shall not be considered for final approval until improvement plans for a water system by one of the following methods have been submitted:
(A) A permanent water distribution system including all pipes, fire hydrants, valves, and other appurtenances shall be provided, and the distribution system shall be connected with an approved public or private water system in accordance with the satisfactory plans and specifications therefore.
(B) If the area proposed to be platted is not so located with regard to an adequate public or group water supply system, before any structure on any lot therein is occupied, an individual water supply system for the lot shall be constructed and installed in accordance with the satisfactory plans and specifications therefore. In no case will any part of the private water system be located closer than 15 feet to a property line or within 50 feet of a private sewage disposal system.
(Ord. 121410A, passed 1-11-2011)