9.8.054: STANDARDS FOR RIVERINE FLOODPLAINS WITH BASE FLOOD ELEVATIONS BUT WITHOUT ESTABLISHED FLOODWAYS:
   (A)   Along rivers and streams where base flood elevation (BFE) data is provided by FEMA or is available from another source but floodways are not identified for a special flood hazard area on the FIRM or in the FIS report, the following requirements shall apply to all development within such areas:
      1.   Standards of sections 9.8.051 and 9.8.052 of this section 9.8.05; and
      2.   Until a regulatory floodway is designated, no encroachments, including fill, new construction, substantial improvements, or other development shall be permitted unless certification with supporting technical data by a registered professional engineer is provided demonstrating that the cumulative effect of the proposed development, when combined with all other existing and anticipated development, will not increase the water surface elevation of the base flood more than one foot (1') at any point within the community. (Ord. 977, 1-3-2019, eff. 2-1-2019)