1343.07 STANDARDS FOR ISSUANCE OF PERMIT.
The Building Commissioner shall issue a permit for the moving of a building if he finds upon inspection that all of the following requirements are met:
(a) The requirements of the building, plumbing, electrical, heating and zoning codes will be met by the building in its proposed new location.
(b) The application requirements and the necessary fee or deposit requirements has been complied with.
(c) The building is of such physical dimensions and of such condition as to permit its movement without endangering persons or property in the Municipality.
(d) That the building is not in such a state of deterioration or disrepair or otherwise structurally unsafe so that it may be moved without endangering persons and property in the Municipality.
(e) If the removal location is in the Municipality, that the building is structurally safe and fit for the purpose for its intended use upon the new location.
(f) That the applicant's equipment is safe and that the persons and property will not be endangered by its use.
(g) That there exists no other condition which might endanger persons or property in the Municipality by moving of the building.
(Ord. 1083. Passed 1-20-69.)