1309.12 GRADING APPROVAL AND INSPECTION.
   (a)    Prior to the footers of any proposed structure being constructed, the owner or his/her agent shall file with the Building Commissioner/Service Director a certification of a registered Engineer or Surveyor certifying that the footer forms have been set in conformance with elevation and location indicated on the approved building plan for such proposed structure.
   (b)    Immediately after all construction of the foundation walls have been constructed above grade, all further construction shall cease until a certification of a registered Engineer or Surveyor is filed with the Building Inspector, certifying that the foundation walls have been constructed in conformance with the elevation and location indicated on the approved building plan for such proposed structure.
   (c)    If the work for which a building permit has been issued is not being performed in conformity with this Building Code, or with the detailed statements, plans or drawings on which such permit was issued, such work shall be suspended without delay. No person shall proceed further with such work.
   (d)    The Building Commissioner/Service Director shall notify the owner or his/her agent that the work is being constructed in violation of this Building Code and that such work be suspended without delay. A written notice of the suspension work shall be posted on the building or other structure for which the permit was issued. No person shall perform any work on or about such building or structure until such notice has been rescinded by the Building Commissioner/Service Director.
(Ord. 90-31. Passed 7-16-90.)