1305.11 FEES FOR SUBMISSION OF PLANS.
(a) All plans for new buildings, structures or exterior alterations shall be submitted to the Architectural Review Board with the applicable fee in accordance with the fee schedule as set forth in Section 1309.05, through the Building Commissioner. No permit shall be issued by the Building Commissioner unless plans and specifications shall have been first approved in writing by the Board upon the affirmative vote of a majority of its members present at a meeting of the Board. No meeting of the Board will occur until all fees are collected by the Building Commissioner.
(Ord. 95-53. Passed 8-21-95.)
(b) Six sets of plans shall be submitted. All drawings shall be identified as to sublot number, street name, development name, builder's name, owner's name if established, and date. Drawings shall include the following:
(Ord. 92-39. Passed 10-19-92.)
(1) Site and location plan, which shall show the existing adjacent finished grades and proposed finished grades relative to street grade. The plans should include sewer connection elevations.
(2) Basement or foundation plans at the scale of one-fourth inch equals one foot.
(3) All other floor plans at the scale of one-fourth inch equals one foot.
(4) All exterior elevations at the scale of one-fourth inch equals one foot minimum for houses.
(5) Roof plan for flat roof structures showing all projections, equipment, chimneys, etc. giving their heights above the roof line if not shown on the elevations. Method of screening exposed equipment shall be indicated.
(6) Sufficient scaled details including typical wall sections, special wall sections, special framing conditions, unusual exterior trim or material usage or any other information needed to thoroughly and clearly indicate the intended final configuration of the structure.
(7) Location of garages and driveways should be shown on the plot plan at the scale shown.
(8) All drawings shall be shown at a definite scale, as indicated, and shall be reproduced at the scale shown. The drawings and plans submitted shall be drawn as the building is proposed to be built. All drawings shall be done in a clear, well-defined and workmanlike manner. Any drawings submitted that are crude, unclear, inaccurate or confusing shall be rejected by the Architectural Review Board and shall be redrawn correctly and resubmitted.
(9) No changes in the proposed structure shall be made without revised drawings being resubmitted to the Board before construction is done. This includes items such as relocation, removal or addition of windows, changes in exterior materials and colors, changes in exterior details, etc.
(10) All houses shall meet the requirements to prevent look-alike structures being constructed too close together.
(Ord. 92-36. Passed 10-5-92.)
(c) A schedule of exterior materials, finish and colors, must be shown on the drawings submitted. The Board shall request samples of exterior materials. Plans for remodeling buildings which affect the exterior appearance shall be accompanied by a drawing sufficient to show the existing building or with photographs of the existing building and surroundings.
(Ord. 87-24. Passed 10-19-87.)