943.02 PHOTOGRAPHS OF NEW SYSTEM REQUIRED.
(a) The Municipal Engineer is hereby directed to require, prior to final approval of any newly installed sewer system and/or reconstructed sewer, that the contractor constructing such sewer or the developer of the subdivision in which such sewer has been installed, cause to be made one set of photographs of the entire sewer system installed, both sanitary and storm, at the completion of all mains, showing thereby that the sewer system has been constructed upon sound engineering standards and that the system is free of any and all accumulations of foreign substance and debris and that the passage and flow of sewage and storm water will be free and clear.
(b) Upon inspection of such photographs, and if satisfied that such sewer is free and clear of all foreign substances and debris, and is of sound workmanship and complies with sound engineering standards, the Municipal Engineer is thereupon authorized to approve same as a final inspection, placing in safe keeping all photographs so taken for future reference.
(c) The cost of such photographing and photographs and of any inspection report made pursuant thereto shall be entirely paid for by the contractor constructing such sewer system or the developer of the subdivision and the photographs shall remain the property of the Municipality. (Ord. 1029. Passed 9-18-67.)