§ 154.099 SANITARY SEWAGE SYSTEM.
   (A)   Sewerage distribution system. Sanitary sewerage facilities shall be designed and constructed in compliance with the rules and regulations and permits which must be obtained from the Metropolitan Sanitary District of Greater Chicago and Illinois Environmental Protection Agency. Plans, specifications and construction work shall be subject to the approval and inspection of both the Metropolitan Sanitary District of Greater Chicago and the Village Engineer. The Village Engineer shall be given not less than three working days’ notice in writing prior to commencement of construction.
   (B)   Sanitary sewer house service.
      (1)   All sanitary sewer house services that are to be constructed in the village shall be PVC SDR-26 pipe, shall not be less than six inches in diameter, and shall be installed in compliance with the Manual of Procedures for the Administration of the Sewer Permit Ordinance of the Metropolitan Sanitary District of Greater Chicago. The connection of the stub out of the building with the sanitary sewer house service shall be made with what is commonly known as a “mission band coupling”.
      (2)   The sanitary sewer house service shall be defined as the sewer between the trunk line and the building.
(2000 Code, § 155.084) (Ord. 876, passed 8-4-1975) Penalty, see § 154.999