§ 154.095 COMPLIANCE REQUIRED.
   The construction of all improvements required by this chapter shall be in compliance with the specifications set forth herein. Unforeseen construction or improvements, as may be required by unusual topographic, soil or other conditions, shall be subject to the approval of the Village Engineer. In these special cases, prior to actual construction, drawings, reports, data, work sheets and estimates of cost may be requested. Unless otherwise specified, all street, sidewalk, storm drainage, sanitary sewer, water, street light and such other improvements required, shall be designed and constructed in compliance with the latest issue of Standard Specifications for Road and Bridge Construction as published by the State Department of Transportation; Standard Specifications for Traffic Signals as published by the State Department of Transportation; The Sewer Permit Ordinance of the Metropolitan Sanitary District of Greater Chicago; American National Standard Practice for Roadway Lighting, sponsored by the Illuminating Engineering Society; regulations published by the Illinois Environmental Protection Agency; Standard Specifications for Water and Sewer Construction in Illinois as published by the Illinois Society of Professional Engineers et al; and such other specifications as may be published by governmental agencies having control over design standards in this state. Plans, specifications and estimates of cost for all improvements must be submitted in quadruplicate to the Village Engineer for his or her review and approval.
(2000 Code, § 155.080) (Ord. 876, passed 8-4-1975) Penalty, see § 154.999