(a) Schedule. Applications for an electrical permit shall be accompanied by a permit fee and no electrical permit shall be issued until such fee is paid. The amount of the fee shall be determined as follows: Only includes final inspection
A flat fee will be charged for each permit issued as follows:
Residential construction up to and including a three family dwelling: | |
Flat fee | $50.00 |
plus the below listed table if applicable | |
Commercial construction: | |
Flat fee | $100.00 |
plus the below listed table if applicable: |
(1) | Each rough inspection | $50.00 |
(2) | Any requested inspection | $30.00 |
(3) | Re in spection fee for code violation | $35.00 |
(4) | No Show re inspection fee | $ 75.00 |
(5) | 100 AMP service or less | $ 20.00 |
(6) | 200 Amp service | $ 25.00 |
(7) | 400 AMP service | $ 30.00 |
(8) | For each additional 100 amps | $ 1.50 |
(9) | Additional meters at same address | $ 10.00 |
(10) | 1-5 outlets, switches, and lights | $ 5.00 |
(11) | Next 45 outlets | $ .30 |
(12) | Over 50 outlets | $ .25 |
(13) | 10 KVA transformers or less | $ 5.00 |
(14) | 10 KVA transformers or more | $ 7.50 |
(15) | Signs | $ 25.00 |
(16) | Electric appliances over 1500 w | $ 5.00 |
(17) | Additional appliances | $ 3.00 |
(18) | Electrically controlled heating units | $ 5.00 |
(19) | Panel boards 100 to 400 AMPS | $ 5.00 |
(20) | Disconnects 30 Amp to 100 Amp | $ 5.00 |
(21) | Panel boards & disconnects for each additional 100 amp/less | $ 1.00 |
(22) | Gasoline dispensing pump | $ 15.00 |
(23) | Swimming pool pump | $ 25.00 |
(24) | Each air conditioner | $ 5.00 |
(25) | Each furnace | $ 5.00 |
(26) | Temporary service inspection | $ 25.00 |
(27) | Water heater | $ 5.00 |
(28) | Generator | $ 20.00 |
Low Voltage Wiring Permits | |
Commercial Application Fee: | $100.00 |
Main Panel: | $ 10.00 |
Telecommunications outlets/drops (1-5): | $ 5.00 |
Each additional outlets/drops: (6 or more outlets/drops) | $ 0.25 |
Minimum fee on commercial permit is: | $100.00 |
(b) Penalty.
(1) Any permit not applied for in writing before work is in progress shall be subject to a one hundred percent (100%) penalty in addition to the regular fee for all work done and to be done under such permit. The penalty shall be in addition to that provided in Section 1313.99. If the penalty and regular fee are not paid within five days of the request, the contractor's license shall be immediately suspended until such time that the penalty and regular fee are paid.
(2) If electrical work has not commenced within, or if work has been suspended for a period of ninety days, the permit shall be revoked immediately.
(3) There shall be a $100.00 penalty assessed for not requesting a Final Electrical Inspection.
(Ord. 153-2010. Passed 12-20-10.)