925.59 WASTEWATER DISCHARGE PERMITS DATA DISCLOSURE.
   (a)   General Permits Disclosure. All Industrial Dischargers proposing to connect to or to discharge sewage, industrial wastes, and other wastes comply with all terms of this chapter within ninety days after the effective date of this chapter.
   (b)   Disclosure Forms. Industrial Dischargers shall complete and file with the Authority, a disclosure declaration in the form prescribed by the City and accompanied by the appropriate fee. Existing Industrial Dischargers shall file disclosure forms within thirty days after the effective date of this Ordinance, and proposed new Dischargers shall file its disclosure forms at least ninety days prior to connecting to the POTW. The disclosure to be made by the Discharger shall be made on written forms provided by the Authority and shall cover:
      (1)   Disclosure of name, address, and location of the Discharger;
      (2)   Disclosure of Standard Industrial Classification (SIC) number according to the Standard Industrial Classification Manual, Bureau of the Budget, 1972, as amended;
      (3)   Disclosure of wastewater constituents and characteristics including but not limited to those mentioned in this chapter as determined by bonafide chemical and biological analyses. Sampling and analysis shall be performed in accordance with procedures established by the U.S. EPA and contained in 40 CFR, Part 136, as amended;
      (4)   Disclosure of time and duration of discharges;
      (5)   Disclosure of average daily and instantaneous peak wastewater flow rates, in gallons per day, including daily, monthly, and seasonal variations, if any. All flows shall be measured unless other verifiable techniques are approved by the Authority due to cost or nonfeasibility.
      (6)   Disclosure of site plans, floor plans, mechanical and plumbing plans and details to show all sewers, sewer connections, inspection manholes, sampling chambers, and appurtenances by size, location, and elevation;
      (7)   Description of activities, facilities, and plant processes on the premises including all materials which are or may be discharged to the sewers or works of the City;
      (8)   Disclosure of the nature and concentration of any pollutants or materials prohibited by this chapter in the discharge, together with a statement regarding whether or not compliance is being achieved with this chapter on a consistent basis, and if not, whether additional operation and maintenance activities and/or additional pretreatment is required for the Discharger to comply with this chapter;
      (9)   Where additional pretreatment and/or operation and maintenance activities will be required to comply with this chapter, the Discharger shall provide a declaration of the shortest schedule by which the Discharger will provide such additional pretreatment and/or implementation of additional operational and maintenance activities;
      (10)   Disclosure of each product produced by type, amount, process or processes and rate of production;
      (11)   Disclosure of the type and amount of raw materials utilized (average and maximum per day);
      (12)   All disclosure forms shall be signed by a principal executive officer of the Discharger, and a qualified engineer (licensed professional).
         (Ord. 69-1991. Passed 4-15-91.)