(a) All Users who propose to discharge or who in the judgment of the City could now or in the future discharge wastewater with constituents and characteristics different from that produced by a domestic premise may be required to install a monitoring facility.
(b) Monitoring Facility Requirements.
(1) Each discharger shall provide and operate at the discharger’s own expense, a monitoring facility to allow inspection, sampling and flow measurement of each sewer discharge to the City’s wastewater treatment facilities. Each monitoring facility shall be situated on the discharger’s premises, except where such a location would be impractical or cause undue hardship on the discharger, the Manager may concur with the facility being constructed in the public street or sidewalk area providing that the facility is located so that it will not be obstructed by landscaping or parked vehicles.
(2) There shall be ample room in or near such sampling facility to allow accurate sampling and preparation of samples for analysis. The facility, sampling, and measuring equipment shall be maintained at all times in a safe and proper operating condition at the expense of the discharger.
(3) All monitoring facilities shall be constructed and maintained in accordance with all applicable local construction standards and specifications. Construction shall be completed within 120 days of receipt of the City’s authorization to proceed.
(Ord. 140-2012. Passed 1-22-13.)