§ 116.081 SYSTEM DESIGN REVIEW PROCESS.
   (A)   In addition to any requirements included in a franchise agreement, at least 60 days prior to the date construction of any rebuild is scheduled to commence, the franchisee shall provide the Village Clerk with notice that a detailed system design and construction plan is available for review by the village at a specific office of the franchisee located in the county, which shall include at least the following elements:
      (1)   Design type, trunk and feeder design and number and location of hubs or nodes;
      (2)   Distribution system-cable, fiber and equipment to be used;
      (3)   Plans for standby power;
      (4)   Longest amplifier cascade in system (number of amplifiers, number of miles, type of cable/fiber); and
      (5)   Design maps and tree trunk maps for the system.
   (B)   The system design will be shown on maps of industry standard scale using standard symbols and shall depict all electronic and physical features of the cable plant. The village may review the plan and, within 30 days of the date the plan is made available for village review, submit comments to the franchisee. Within 15 days of receipt of the comments, the franchisee shall notify the Village Clerk that a revised plan is available for review by the village at a specific office located in the county, either incorporating the comments or explaining why the comments were not included. The village’s review does not excuse any non-performance under a franchise agreement, this code or other applicable law.
(`92 Code, § 8-1-70) (Ord. 96-19, passed 10-2-96)