(A) The insure accurate as-constructed utility documentation, the following minimum Geographic Information is required from the developer.
(B) Minimum GIS information requirements for water, sewer, and storm drainage.
(a) During installation of the water distribution and sewer collection system as part of the development, actual point coordinate locations (X, Y, and Z) must be captured and provided to the village;
(b) Coordinates will be provided at the top and center of the following facilities:
1. Water mains and force mains at deflection points and every 200 feet along straight runs;
2. The center of each fitting, valve, blowoff and hydrant;
3. The location of each connection to existing facilities;
4. The corners (vertices) of all lots being platted to as a part of the project;
5. The location of each sanitary sewer manhole;
6. The location of each storm sewer inlet and outlet to surface drainage with the size of each pipeline shown; and
7. Other locations designated by the village.
(Ord. 2024-32, passed 5-1-24)