(A) Applicants desiring to use water from the village waterworks system for building or construction purposes shall make application therefor to the Superintendent of the Water and Sewer Department on a form provided by the Water and Sewer Department for that purpose.
(B) (1) Upon a permit being granted, the service pipe shall be carried at the expense of the applicant to the property line and/or meter location where a service cock and meter shall be placed with pipe leading to the surface and a faucet placed at the end thereof above the surface. When the building or construction is completed, the faucet and meter shall be removed and the water shut off unless permanent connection is made in accordance with the provisions of this chapter.
(2) Charge for the use and connection of the meter shall be prescribed by the Superintendent of the Water and Sewer Department.
(`92 Code, § 38-3-9) (Ord. 95-34, passed 11-1-95; Am. Ord. 2023-67, passed 12-6-23)