§ 23-601.   Head Pump Installations.
   1.   The pump head shall be designed and constructed to prevent contamination from reaching the water chamber and other interior surfaces of the pump.
   2.   The pump shall be designed and constructed to provide an effective watertight seal with the well casing or stored water reservoir.
   3.   The pump cylinder or foot valve shall be installed below the pumping level of the well.
   4.   The pump shall be designed where necessary for protection against freezing.
   5.   All pump information must be submitted in writing on the Marysville Borough Construction Form 23-2 within 5 days of completion of the drilling process.
(Ord. 613, 5/11/2015)