§ 22-606.   As Built Plans.
Within 90 days of construction completion of all required improvements including facilities proposed for dedication to the Borough and prior to final inspection by the Borough of all improvements and site grading for which an improvement guarantee has been posted, the developer shall submit a plan labeled “as-built plan,” which shall depict the actual location, dimensions and elevations of all existing improvements and site grading. In addition, the plan shall indicate that the existing grading, drainage structures and/or drainage systems and erosion and sediment control practices, including vegetative measures, are in substantial conformance with the previously approved drawings and required specifications. The plan shall note all deviations from the previously approved drawings. The applicant’s engineer shall certify that the construction of the storm water management facility was completed in accordance with the plans and specifications as originally submitted and approved by the Borough. Three copies of the as- built plan (2 paper and 1 transparency) shall be submitted to the Borough, which shall distribute a paper copy to the Borough Engineer and retain 2 copies for Borough files for future reference.
(Ord. 614, 5/11/2015)