Where public infrastructure improvements have been installed prior to recording of the plat, the property owner shall submit a maintenance bond from each contractor, three sealed sets of "as-built" plans or record drawings, one sealed set of "as-built" Mylars, and one CD containing a digital copy of all plans (in a format as determined by the City Engineer together with a letter stating the contractors' compliance in accordance with this chapter, and bearing sealed certification by the design engineer that all public improvements have been constructed in compliance with all city construction standards. The property owner also shall submit copies of the approved final plat with any required revisions on Mylars and in the format and number required by the City Engineer, together with all certifications required.
(Ord. 08-358, passed 11-18-2008)