§ 154.058 INSPECTIONS; FEE; PROCEDURE.
   (A)   Fees for inspections shall be set by resolution.
(2013 Code, § 11-45)
   (B)   (1)   Upon the completion of electrical work that has been done under a permit other than annual permit, the person, firm, corporation or other association doing the work shall notify the Electrical Inspector.
      (2)   The Inspector shall make such inspection within 24 hours, exclusive of Saturdays, Sundays and holidays, after receipt of notice, or as soon thereafter as practicable.
      (3)   If the Inspector finds the work to be in conformity with the provisions of this chapter, he or she shall issue to the person or association that has done the work a certificate of approval. This certificate shall authorize the use of the work and its connection to the supply of electricity. The Inspector shall deliver to the agency supplying the electricity a certificate of authorization.
      (4)   A certificate of approval may be issued authorizing the connection and use of a temporary installation. Such certificate shall be issued to expire at a stated time and may be revoked by the inspector for any violation of any of the provisions of this chapter.
      (5)   No person having charge of the construction, alteration or repair of any building or any other person, shall cover or conceal or cause to be covered or concealed any wire or electrical apparatus for which permit has been issued or for which permit is required before said wiring or apparatus has been inspected and approved by the Electrical Inspector.
      (6)   The Electrical Inspector shall have authority to remove or cause the removal of lath, plaster, boarding or other covering which may prevent the proper inspection of any electrical apparatus or wiring. The city assumes no responsibility to replace same.
(2013 Code, § 11-46)
(Ord. 14392, passed 8-14-1992)