§ 55.003 MAJOR EROSION CONTROL PERMIT REQUIRED.
   (A)   General.
      (1)   Sites or common plans of development or sale that will result in a total disturbed area of one or more acres shall obtain a major erosion control permit prior to any land-disturbing activities.
      (2)   All major erosion control permits shall be issued by the city’s Engineering Department upon approval of a completed application for erosion control permit on a form provided by the city. The application shall be signed by the title holder of the site, together with the applicant, if different from the title holder.
      (3)   Sites required to obtain an erosion control permit shall comply with § 55.008 of this chapter, requirements for sites covered by the state’s DNR General Permit No. 2, herein.
      (4)   A major erosion control permit application shall include the following:
         (a)   A completed application for erosion control permit on a form provided by the city’s Engineering Department; and
         (b)   SWPPP conforming to the requirements of this chapter, and the requirements of General Permit No 2. If a SWPPP for the site has previously been submitted to the city and has not been modified, the applicant shall submit a signed and dated statement that the SWPPP has not been modified, in which case the SWPPP need not be resubmitted.
   (B)   Payment of the permit fee. The permittee shall provide the Erosion Control Officer with all material submitted as part of a notice of discontinuation when such a notice is filed with the state’s DNR.
(2013 Code, § 28-162) (Ord. 14824, passed 2-11-2008)