§ 51.040 LAYING OF BUILDING SEWER.
   The building sewer shall be brought to the building at an elevation above the basement floor. No building sewer shall be laid parallel to or within three feet of any bearing wall, which might be thereby weakened. The building sewer shall be laid at uniform grade and in straight alignment insofar as possible. Changes in direction shall be made only with properly curved pipe and fittings.
(Ord. 523, passed 7-1-74; Am. Ord. 1517, passed 9-4-13)