9-1-8: CONDUIT REQUIRED FOR UNDERGROUND WIRING:
All new electrical installation and wiring from the power pole to electric meter shall be enclosed in conduit of PVC pipe schedule 40 for all portions of the electric line running underground. (Ord. 312, 4-25-1989)