The building inspector shall stamp or endorse in writing both sets of plans “APPROVED” and one set of such approved plans shall be retained by the building inspector and the other set shall be kept at the construction site, open to inspection of the building inspector or authorized representative at all times.
(Prior Code, § 4-423) (Ord. passed 8-28-2017)