1313.03 SURVEY OF STREET LINE PRIOR TO CONSTRUCTION; COST.
   Whenever a building or structure is to be erected on, or within five feet of, the line of a street, the Director of Public Safety and Service may cause, at the expense of the applicant, a survey to be made of the street line in front of the premises and may require the estimated cost of such survey to be deposited with the Director before a permit is granted.
(1957 Code §6-11)