§ 54.02 WATER CONNECTIONS REQUIRED.
   (A)   No building, premises or structure shall be erected, built, designed or maintained for the purpose of residential, commercial or industrial use without a connection to and through or by the water system of the Village.
   (B)   No premise, structure or building hereinafter converted or to be converted to residential, commercial or industrial use, shall retain any water system otherwise than a connection with the water system of the Village.
   (C)   A connection permit and water system tap fees will be assessed for any initial connection or upgraded connection to the water system of the Village. The connection permit fee shall be $150. The water system tap fee is be determined by the size of water meter installed. A ¾-inch water system tap fee is $150. A one-inch water system tap fee is $200. The fee for any water system tap larger than one inch will be $300. The connection permit and water system tap fees are payable when the construction permit application is submitted to the Village.
   (D)   A onetime capacity fee will be assessed for any initial connection or upgraded connection to the water system of the Village. The capacity fee is determined by the size of the water line installed. A ¾-inch water line capacity fee is $1,000. A one-inch water line capacity fee is $1,500. The capacity fee for a water line larger than one inch will be determined by the Village Engineer. The capacity fee is due upon final inspection and approval of the water line.
(Ord. O-2388-13, passed 10-21-13) Penalty, see § 54.99