A. As Built Plans: All applicants are required to submit actual as built plans for any structures located on site after final construction is completed. The plan must show the final design specifications for all stormwater management facilities and must be sealed by a registered professional engineer licensed to practice in Utah. A final inspection by the city engineer or designee is required before any performance security or performance bond will be released. The city engineer or designee shall have the discretion to adopt provisions for a partial pro rata release of the performance security or performance bond on the completion of various stages of development. In addition, occupation permits shall not be granted until corrections to all BMPs have been made and accepted by the city engineer or designee.
B. Landscaping And Stabilization Requirements: Any area of land from which the natural vegetative cover has been either partially or wholly cleared by development activities shall be revegetated according to a schedule approved by the city engineer or designee. The following criteria shall apply to revegetation efforts:
1. Reseeding must be done with an annual or perennial cover crop accompanied by placement of straw mulch or its equivalent of sufficient coverage to control erosion until such time as the cover crop is established over ninety percent (90%) of the seeded area.
2. Replanting with native woody and herbaceous vegetation must be accompanied by placement of straw mulch or its equivalent of sufficient coverage to control erosion until the plantings are established and are capable of controlling erosion.
3. Any area of revegetation must exhibit survival of a minimum of seventy five percent (75%) of the cover crop throughout the year immediately following revegetation. Revegetation must be repeated in successive years until the minimum seventy five percent (75%) survival for one year is achieved.
4. In addition to the above requirements, a landscaping plan must be submitted with the final design describing the vegetative stabilization and management techniques to be used at a site after construction is completed. This plan will explain not only how the site will be stabilized after construction, but who will be responsible for the maintenance of vegetation at the site and what practices will be employed to ensure that adequate vegetative cover is preserved.
C. Inspection Of Stormwater Management Facilities: Periodic inspections of facilities shall be performed as provided for in section 21.04.040 of this chapter.
D. Records Of Installation And Maintenance Activities: Parties responsible for the operation and maintenance of a stormwater management facility shall make records of the installation of the stormwater facility, and of all maintenance and repairs to the facility, and shall retain the records for at least three (3) years. These records shall be made available to the city engineer or designee during inspection of the facility and at other reasonable times upon request.
E. Failure To Meet Or Maintain Design Or Maintenance Standards: If a responsible party fails or refuses to meet the design or maintenance standards required for stormwater facilities under this chapter, the city engineer or designee, after reasonable notice, may correct a violation of the design standards or maintenance needs by performing all necessary work to place the facility in proper working condition. In the event that the stormwater management facility becomes a danger to public safety or public health, the city engineer or designee shall notify in writing the party responsible for maintenance of the stormwater management facility. Upon receipt of that notice, the responsible person shall have fifteen (15) days to effect maintenance and repair of the facility in an approved manner. In the event that corrective action is not undertaken within that time, the city engineer may take necessary corrective action. The cost of any action by the city engineer or designee under this section shall be charged to the responsible party. (Ord. 2012-02, 2-21-2012, eff. 3-18-2012)
Next Doc