8-10-4: INSTITUTION OF ADMINISTRATIVE PROCEEDINGS:
The following shall govern the commencement of administrative adjudication proceedings under this chapter:
   (A)   When the director of building and zoning or other individual authorized to issue a building code violation finds a building code violation to exist, he or she shall note the violation on a multiple copy violation notice and report form that indicates: 1) the name and address of the owner of the property; 2) the type and nature of the violation; 3) the date and time the violation was observed; 4) the names of witnesses to the violation; and 5) the address of the property where the violation is observed.
   (B)   The violation report form shall be forwarded to the village of Manteno building code hearing unit where a docket number shall be stamped on all copies of the report and a hearing date shall be noted in the blank spaces provided for that purpose on the form. The hearing date shall not be less than thirty (30) nor more than forty (40) days after the violation is reported.
   (C)   One copy of the violation report shall be maintained in the files of the village of Manteno building code hearing unit and shall become a part of the record. One copy of the report shall be returned to the individual representing the municipality so that he/she may prepare evidence of the code violation for presentation at the hearing. Finally, one copy of the report form shall be served by first class mail to the owner of the structure, along with a summons commanding the owner to appear at the hearing. If the name of the owner of the structure cannot be ascertained or if service on the owner cannot be made by mail, service may be made on the owner by posting or nailing a copy of the violation report form on the front door of the structure where the violation is found, not less than twenty (20) days before the hearing is scheduled. (Ord. 13-05, 5-6-2013)