§ 114.035 SEISMIC SURVEYS.
   (A)   A permit shall be required for seismic surveys conducted on city-owned property or within city rights-of-way unless such requirement is waived by the City Manager or his designated representative.
   (B)   No less than 15 days prior to conducting a seismic survey within the city, the operator must provide written notice to the city, the owners and occupants of property and any homeowners association in subdivisions where surveying will occur. The notice must describe the process of seismic surveying, the date when surveying will begin, the expected duration of the survey, and include the contact information with the name, telephone number and an e-mail address of the operator or contractor performing the survey, and the contact information for the Gas Well Inspector.
   (C)   Seismic surveys shall only be conducted between the hours of 7:00 a.m. to 7:00 p.m., Monday through Friday, and 9:00 a.m. to 6:00 p.m., Saturday. Seismic surveys shall not be conducted on Sundays or holidays.
(Ord. OR-1942-15, passed 3-23-15)