APPENDIX E
Construction Plan Requirements
   The following shall be required as a part of all construction plans submitted to the city when tree removal or tree protection is required during any phase of site work or construction.
1.   A Tree Preservation Detail Sheet shall include the following at a minimum.
   a.   The requirements of § 99.38 (B) through (D) shall be noted.
   b.   A graphics legend to be used throughout the plans for the purposes of showing the following: trees to be flagged, protective fencing, trees requiring bark protection, boring, areas of cut and fill impacting protected trees.
   c.   Graphic tree exhibit showing the features of a tree to include the critical root zone, trunk, canopy, drip line and method of diameter measurement (per Appendices A & B).
   d.   Graphic exhibits showing methods of protection to include snow fences, boarded skirts and the like.
   e.   Graphic exhibits showing construction methods to include grade changes, boring, trenching and the like.
   f.   Graphic exhibit showing appropriate pruning practices (per Appendix F).
2.   All practices which will be employed in meeting the requirements of this chapter shall be shown graphically on all applicable sheets within the construction plans.
3.   Documents as required in Appendix D herein.
(Ord. 1220, passed 7-27-98)