§ 92.45 INSPECTIONS.
   (A)   Preoperational inspections. The regulatory authority shall inspect a newly constructed or remodeled public pool, spa. or interactive water feature prior to operation to determine compliance with approved plans and specifications and with the requirements of these regulations. Requested inspections must be made a minimum of three working days prior to the desired opening date.
   (B)   Inspections. The regulatory authority shall inspect all public pools, spas, or interactive water features at least once per year. The owner or operator shall request an inspection by permit application providing the pool, spa, or interactive water feature owner’s name and address and, if different, the pool or spa operator’s name and address.
   (C)   Inspection fees. A fee, as set out, adopted, and defined in the Regulatory Compliance Department fee schedule, shall be required to be paid for preoperational inspections and, thereafter, on an annual basis. Fees shall be paid to City of Mansfield Regulatory Compliance Department, 1200 E. Broad Street, Mansfield, Texas 76063. Inspection fees shall be based on the number of public pools and/or spas located at a single address.
   (D)   If a facility is closed for noncompliance of this subchapter more than one time during a pool season, or remains closed for a period longer than one month due to noncompliance, a reinspection fee shall be assessed in accordance with the Department of Regulatory Compliance fee schedule prior to the performance of an inspection conducted for the purpose of reopening the facility.
(Ord. OR-1930-14, passed 11-24-14; Am. Ord. OR-2230-21, passed 12-13-21; Am. Ord. OR-2252-22, passed 5-9-22)