The purpose of this subchapter shall be to generate sufficient revenue to pay all costs for the operation and maintenance of the complete wastewater system. The costs shall be distributed to all users of the system in proportion to each user’s contribution to the total loading of the treatment works. Factors such as strength (BOD and TSS), volume and delivery flow rate characteristics shall be considered and included as the basis for the user’s contribution to ensure a proportional distribution of operation and maintenance costs to each user (or user class).
(Prior Code, § 13.08.010) (Ord. 372, passed - -1989)