§ 55.005 MISCELLANEOUS FEES AND CHARGES.
   Miscellaneous charges and fees shall be as follows:
   (A)   Non-metered residential users shall be assigned a minimum monthly billable flow of not less than 10,000 gallons per month.
   (B)   Non-metered commercial uses shall be assigned a minimum monthly billable flow of not less than 15,000 gallons per month.
   (C)   An inspection fee of $50 will be charged for each inspection of each direct connection to any village water main by any water service within the village or located outside the corporate limits of the village.
   (D)   An inspection fee of $50 will be charged for each inspection of each direct connection to any village sanitary sewer by any building sewer or private service line within the village or located outside the corporate limits of the village.
   (E)   In the event that a water or wastewater system connection does not pass initial inspection, a reinspection fee of $50 shall be due and payable for each instance of reinspection.
   (F)   A one-time new account and service application fee of $20 for each type of service shall be due and payable at the time of application for water and/or wastewater service ($40 for both water and wastewater service).
   (G)   A past due/delinquent notice charge of $10 shall accrue for each delinquent payment notice issued.
   (H)   A late payment charge of 10% of the amount of the bill shall be due and payable for all past due bills.
   (I)   A delinquent charge of 1% per month shall be due and payable for all delinquent bills that are more than 30 days past due.
   (J)   A fee of $30 shall be due and payable for restoring water and/or wastewater service in the event that service was disconnected due to late payment, due to non-payment, or due to violation of village code requirements. The fee shall be paid before service is restored.
   (K)   A fee of $10 shall be due and payable for restoring water and/or wastewater service in the event that the service was discontinued at the customer’s request.
   (L)   A fee of $50 shall be due and payable for testing a meter upon request of a customer when it is determined that the meter is operating correctly. No fee shall be applicable if the meter is found to be inaccurate.
   (M)   A fee of $500 shall be due and payable for application for extension of the public water system for instances that do not involve the subdivision of land.
   (N)   A fee of $25 shall be due and payable for any payment paid by check which is returned by the bank for insufficient funds.
   (O)   A fee of $500 shall be due and payable for application for extension of the wastewater system for instances that do not involve the subdivision of land.
   (P)   A fee of $50 shall be due and payable for the installation of a temporary water meter and temporary connection to the village water supply system.
   (Q)   A connection fee of $500 shall be due and payable for the installation of a private fire service connection.
   (R)   A well drilling permit application fee of $100 shall be due and payable for the construction of a private well.
   (S)   A private on-site wastewater system permit application fee of $100 shall be due and payable for the construction of a private wastewater disposal system.
   (T)   An industrial discharge connection application fee of $500 shall apply to all industrial wastewater connections. The industrial discharge connection application fee shall be in addition to the standard wastewater connection fee.
   (U)   An inspection fee of $50 shall be charged for each inspection of a private on-site wastewater treatment system.
   (V)   A meter installation fee shall be charged for the initial installation of a water meter for any customer. The meter installation shall be set by the Village Administrator on or about May 1 of each year. The fee shall be the actual cost to purchase the meter plus an additional $25 handling charge.
   (W)   A deposit of $100 shall be due and payable for the installation of a secondary meter for outside water use, in addition to the standard meter fee.
(Ord. 18-04-01, passed 4-24-2018)