§ 53.061 INDUSTRIAL DISCHARGE PERMITS REQUIRED.
   (A)   It shall be unlawful for any industrial user to discharge wastewater to the village public sanitary sewers without a permit issued by the village in accordance with the provisions of this chapter.
   (B)   Users required to obtain an industrial wastewater discharge permit shall complete and file with the village an application in a form to be prescribed and furnished by the village, and accompanied by a fee to be determined by the Village Board of Trustees. In support of the application, the user shall submit, in units and terms appropriate for evaluation, the following information:
      (1)   Name, address and location;
      (2)   SIC number according to the Standard Industrial Classification Manual, Bureau of the Budget, 1972, as amended;
      (3)   Wastewater constituents and characteristics including, but not limited to, those set forth in this chapter as determined by a reliable analytical laboratory;
      (4)   Time and duration of pollutant discharges;
      (5)   Average and maximum wastewater flow rates, including monthly and seasonal variations, if any;
      (6)   Site plans showing all pipe sizes, manholes, and location of sanitary sewer and storm drains leaving the building or premises, together with all connections to lateral sanitary sewers and storm drains;
      (7)   Listing of each process activity;
      (8)   Line diagram and basic information, including capacity of existing or proposed spill containment areas and installation;
      (9)   Total number of employees and hours of operation of a plant;
      (10)   Proposed or actual hours of operation of pretreatment system and the name of the IEPA certified pretreatment operator;
      (11)   Name of authorized representative of the industrial user;
      (12)   User’s source of intake water together with the types of usage and disposal sources of water and the estimated volumes of each category;
      (13)   Listing of raw materials and chemicals that are being used in the manufacturing process and are capable of being discharged into the wastewater treatment facilities;
      (14)   If additional user operation and maintenance or pretreatment techniques or installation will be required to meet the applicable pretreatment standards, the user shall indicate the shortest schedule by which the user will provide the additional pretreatment. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard; and
      (15)   Any other information as may be deemed by the Village Engineer to be necessary to evaluate the permit application.
(Ord. 18-04-01, passed 4-24-2018)