§ 55.04 POST-CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN REVIEW AND APPROVAL.
   The City Engineer shall review the post-construction SWPPP in conjunction with the review of the erosion and sediment control plan as described in §§ 54.08 and 54.09. Possible actions based on the review of the SWPPP shall be the same as described in § 54.09(A) (i.e. approve, approve with conditions, or disapprove). A site development permit as set forth in § 54.08 shall only be issued following the approval of a project's post-construction SWPPP.
(Ord. 2007-1, passed 2-20-07)