§ 91.21  APPLICATION.
   Applications for such permits shall be made to the Office of the Building Inspector and shall describe the location of the intended excavation or tunnel, the size thereof, the purpose therefor and the  person, firm or corporation for whom or which the work is being done and shall contain an agreement that the applicant will comply with all ordinances and laws relating to the work to be done.  A separate application shall be filed for each and every opening or excavation or tunnel to be made, and each time the Joint Utility Locating Information for Excavators (J.U.L.I.E.) system is used for locating underground facilities prior to excavation. Each such application shall be accompanied by the appropriate fees as required by this section. In the event that multiple J.U.L.I.E. locates are requested under a single permit, the permit holder shall be billed for and shall be responsible for paying a second and subsequent application fees as though an application were actually made to the Office of Building Inspector, and failure to remit the required amount within 30 days following the J.U.L.I.E. locate request shall be considered a violation of this section.
(Ord. 754, passed 11-14-1961; Am. Ord. 1598, passed 12-17-2002)  Penalty, see § 91.99