§ 113.090 WELL INSPECTIONS.
   The Health Department shall be notified at least 48 hours prior to the commencement of any work to construct or deepen a water well for which a permit has been issued, or to seal a water well, boring or monitoring well or to construct, modify, or seal a closed loop well. The Health Officer shall be allowed access to any property for the purpose of performing inspection of water well construction or to inspect the sealing of wells or to investigate abandoned wells. It shall be the responsibility of the water well contractor or registered closed loop well contractor to notify the Health Department as required.
(1993 Code, § 113.60) (Ord. 96-04, passed 5-1-1996; Am. Ord. 2014-17, passed 12-17-2014)