1321.04 MULTIPLE, INDUSTRIAL, INSTITUTIONAL, PUBLIC, EDUCATIONAL AND UTILITIES.
New Construction and Additions General trades, Building - Base Fee $200.00 Plus $25.00 per 100 square feet of gross floor area Zoning - Base Fee $200.00 Mechanical - Base Fee $150.00 Plus $30.00 per 1,000 square feet of gross floor area Central Air Conditioning (new and replacement) $60.00 Electrical - Base Fee $150.00 Plus $30.00 per 1,000 square feet Temporary Service $50.00 Permanent Service $55.00 Emergency Generator $50.00 Underground feeders $50.00 CCTV-MATV $50.00 Security System $50.00 Sound/Communication System $50.00 Fire Alarm System $30.00 per 1,000 square feet Plumbing and Gas - Base Fee $150.00 Plus $20.00 per each fixture, trap, appliance device or gas outlet Sprinkler Fee - Base Fee $150.00 Plus $30.00 per 1,000 square feet Additions Same as new construction and square foot permit fee shall be based on gross square footage of addition per floor. Alterations The above alteration fees are to be paid for each trade involved in the alteration. The alteration fee is based on the gross floor area of the floor or floors on which the alteration is taking place. Building, Mechanical, Electrical, and Sprinkler: Gross Floor Area Fee (each trade) 0 - 2,000 $150.00 2,001 - 5,000 $225.00 5,001 - 10,000 $375.00 10,000 - 20,000 $550.00 Over 20,000 $700.00 Plumbing and Gas: Same as new construction, except base fee is reduced to $50.00 Greenhouse Building - Base Fee $85.00 Plus $3.00 for each 100 square feet of floor area or fraction thereof. |
(Ord. 127-2018. Passed 1-24-19.)