§ 54.17 LOAD CONTROL MANAGEMENT.
   (A)   Every electrical meter serviced by the city’s electrical system shall have load control management hooked to it for the purpose of regulating the peak electrical use in the city. All new electrical services shall include the load control management device before it shall be approved for connection with the city’s electrical system. The city shall provide the load control management devices and shall pay the cost of their installation on all services in effect as of the date of this section. All new electrical services shall receive the load management control device from the city, and installation shall be the cost of the city.
   (B)   Any electrical service found to have the load control management device disconnected shall have their electrical service immediately disconnected from the city’s electrical system, and it will remain disconnected until such time as the management load control device has been reinstalled on the service. A reconnection fee of an amount as set forth in the city’s fee schedule will be charged to any service needing to be reconnected as a result of the disconnection or removal of the load control management device.
(Prior Code, § 3-917) (Ord. 564, passed 9-15-1998)