§ 54.06 INSTALLATION EXPENSE.
   The city shall provide the electrical meter up to and including 200 amps. Anything over 200 amps, consumer pays the difference in cost. The city will have final approval of electrical sockets installed. The expense of above ground installation and wiring from the weatherhead to the points of distribution shall be the responsibility of the consumer. Underground installation may be requested by the consumer and, upon approval of said underground installation, the consumer shall pay all expense above and beyond the expense of providing above ground installation by the city, including any additional expense in providing an electrical disconnect switch at a point located at or near the point where the service line enters the ground. Maintenance and replacement expense shall be apportioned in the same manner.
(Prior Code, § 3-906) (Ord. 369, passed 10-5-1976)
Statutory reference:
   Related provisions, see Neb. RS 17-902