1181.03 COMPLIANCE AND PERMIT REQUIRED.
   Solar Energy Systems shall be designed, erected, installed, operated, and/or maintained only in accordance with the provisions set forth in this Chapter. An Electrical Permit and Building Permit, if structural alterations will be performed, issued by the Building Commissioner shall be required prior to the erection, installation, connection, or operation of any Solar Energy System. Applicants shall provide written evidence that the power company has been informed of the intent to install a Solar Energy System at the subject site. Additionally, applicants shall provide the installation instructions and electrical diagram to the Building Commissioner with such permit application.
(Ord. 2024-11. Passed 5-6-24.)