1022.03  PERMIT FEES.
   Before any permit shall be issued, the applicant shall pay to the Township Secretary a fee as follows:
   (a)   For issuance of a street or highway permit:
      (1)   For any street opening, the minimum fee shall be fifty dollars ($50.00);
      (2)   For any street opening exceeding eight square feet, but not more than thirty-two square feet, the fee shall be one hundred dollars ($100.00);
      (3)   For a continuous opening not exceeding fifteen linear feet, the fee shall be one hundred dollars ($100.00);
      (4)   For each additional linear foot, the fee shall be five dollars ($5.00);
      (5)   For a curb, the fee shall be fifty dollars ($50.00).  For up to twenty linear feet, there shall be an additional fee of three dollars ($3.00) per foot.
   (b)   For issuance of a permit in the sidewalk area, the fee shall be thirty-five dollars ($35.00).
   (c)   For any opening in the grass area between the curb and sidewalk area for the purpose of installing water mains, gas mains, electric lines, cable television or any other utility, the permit fee shall be fifty dollars ($50.00) for the first fifty feet and one dollar ($1.00) for each additional foot.
(Ord. 91-12.  Passed 12-16-91.)