§ 11.157 BUILDING PERMIT FEES.
   Cost valuation based on “ICC” refers to the most current International Code Council's Building Valuation Data (BVD). Cost valuation based on “ECV” refers to the estimated construction costs.
   Description
   Cost
   Description
   Cost
(A) Construction Permit Fees
 
 
   (1)   Agricultural
$9/$1,000 ICC
$75 min.
   (2)   Residential - 1 & 2 Family
 
 
      (a)   New construction
$9/$1,000 ICC
$75 min.
      (b)   Additions, Alterations, Remodels
$9/$1,000 ECV
$75 min.
   (3)   Residential - Multi-Family ( 3+). including condos, apts.
 
 
      (a)   New construction:
$10/$1,000 ICC
$150 min.
      (b)   Additions, Alterations, Remodels:
$10/$1,000 ECV
$150 min.
   (4)   Commercial / Industrial
 
 
      (a)   New construction:
$10/$1,000 ICC
$150 min.
      (b)   Additions, Alterations, Remodels:
$10/$1,000 ECV
$150 min.
(B)   Electric Permit Fees
 
 
   (1)   Residential (all)
 
 
      (a)   New construction
$100 (100 amp) + $100 for interior wiring
      
$125 (200 amp) + $100 for interior wiring;
$0.25 per amp over 200 amp
 
$50 flat fee for temporary pole 200 amps & under
      (b)   Additions, Alterations, Remodels
$100 (100 amp service change + $50 with misc. wiring together)
 
$125 (200 amp service change + $50 with misc. wiring together); $0.25 per amp over 200 amp
 
$100 (100 amp service change)
 
$125 (200 amp service change); $0.25 per amp over 200 amp
 
$75 flat fee (NIPSCO inspection)
 
$75 flat fee for branch circuit or misc. wiring
   (2)   Commercial/Industrial
$100 (100 amp) + $150 for interior wiring
 
$125 (200 amp) + $150 for interior wiring;
$0.25 per amp over 200 amp
 
$150 Interior build-out
 
$100 misc. wiring
 
$50 flat fee for temporary pole
 
$75 per sign (hook-up)
 
$75 (NIPSCO Inspection)
 
(C)   Plumbing Permit Fees
 
 
   (1)    Agricultural/Residential - 1 & 2 Family
$70 + $5 per fixture
   (2)   Residential - Multi-Family / Commercial / Industrial
$75 + $5 per fixture
 
(D)   (HVAC) Mechanical Permit Fees
 
 
   (1)   Agricultural / Residential (all)
$75 per unit
   (2)   Office / Commercial / Industrial / all other uses not specified
$100 per HVAC unit in/on the building
(E)   Accessory Structure Permit Fees
 
 
   (1)   Swimming Pools
 
 
      (a)   Above-ground
$150
 
      (b)   Above-ground Temporary / Inflatable
$50
 
      (c)   In-ground
$50 plus $7/$1,000 ECV
   (2)   Fences
$50
 
   (3)   Decks
$50
 
   (4)   Sheds
$50
 
(F)   Improvement Location Permit Fees (Zoning Fees)
 
   (1)   Residential (all) / Agricultural Commercial / Industrial
$50
 
   (2)   All additions
$25
 
   (3)   All accessory structures, including garages, carports, in-ground swimming pools, etc.
$25
 
(G)   Miscellaneous Permit Fees
 
 
   (1)   Fireplace
$50 per fireplace
 
   (2)   Lawn Sprinkling Systems
$50
 
   (3)   Fire Sprinkling Systems
      This permit fee is separate and in addition to the fire inspection fees in § 11.095, if applicable.
$50
 
   (4)   Grade Alteration / Fill
$50
 
   (5)   Curb / Street Cut
$50
 
   (6)   Demolition
$25
 
   (7)   Re-Inspection Fee
$50
 
   (8)   Renewal of Permit
      (one time, only)
20% of the original cost + $25.00 per inspection for each required inspection to finalize project
   (9)   Certificate of Occupancy
$25 per unit
 
 
(Ord. 2022-10, passed 6-13-22)