§ 52.044 CONSTRUCTION SPECIFICATIONS.
   (A)   All service lines and water mains shall be constructed and/or installed as specified in the town water utility's construction specifications and contractor's handbook or as required by the administrative authority. The contractor/owner shall submit all plans and documents as required by the town's administrative authority and comply with all requirements of superseding agencies before construction is to begin. All permits, easements or right-of-ways shall be obtained prior to final approval of plans and/or construction. Any deviations from specifications or engineered drawings must be accepted by the town's administrative authority in writing before any changes can be made to service lines and distribution mains or any part thereof detailed in the plans. Deviation from specified materials as described in the town Water Utility's construction specifications shall be accepted by the town's administrative authority before installation.
   (B)   Installation of material prior to acceptance in writing by the town's administrative authority will result in discontinued water service to the area or penalty or both until complete compliance to material specifications and construction requirements are satisfied as determined by the town's administrative authority.
   (C)   Any service line, water main, or equipment installed in a manner which does not follow the town Water Utility's construction specifications and contractor's handbook as determined by the town's administrative authority is subject to denial of acceptance and all deficiencies will be rectified before water service is permitted.
('80 Code, §13.12.050)