§ 52.042 LAYING OF SERVICE LINE.
   (A)   Every service pipe shall be provided with a control valve for each consumer, easily accessible and so situated that the water can be conveniently shut off in the basement or crawl space as specified in town's construction specifications and contractor's handbook. Such control valve shall be equal in strength to the ferrule in the street main. There shall be placed upon each service pipe connected with the city water system a curb box and a cutoff valve, either at the sidewalk or pavement line, or the property line, as the Superintendent directs, and in no event shall such curb box or cutoff valve be placed upon private property or beyond the jurisdiction of the town.
   (B)   The water utility's responsibility stops at the curb valve or meter pit. If both are used the point at which the utility's responsibilities end shall be at the valve closest to the water main.
('80 Code, §13.12.030)