§ 52.04  SEWER CONNECTIONS REQUIRED; SEPARATE CONNECTIONS.
   (A)   Within 30 days after the sewer main in any street is completed and ready for use, if a water main shall also have been installed in the street, the owner of any abutting lot having thereon improvements for human occupancy, shall cause a water closet and sink to be installed and to be connected with the sewer main. All other sewer facilities within such improvements, if any, are also to be connected with the sewer main.
   (B)   Every house or building abutting any sewer main shall be separately and independently connected to the main.
(1995 Code, § 5-25)  Penalty, see § 10.99