8-2-14: CARE OF EXCAVATED MATERIAL:
   A.   Piling Adjacent To Trench: All material excavated from trenches and piled adjacent to the trench or in any street shall be piled and maintained in such a manner as not to endanger those working in the trench, pedestrians or users of the streets, and so that as little inconvenience as possible is caused to those using streets and adjoining property.
   B.   Use Of Storage Site: Where the confines of the area being excavated are too narrow to permit the piling of excavated material beside the trench, such as might be in the case of a narrow alley, the city administrator or his designee shall have the authority to require that the permittee haul the excavated material to a storage site and then rehaul it to the trench site at the time of backfilling. It shall be the permittee's responsibility to secure the necessary permission and make all necessary arrangements for all required storage and disposal. (Ord. 751, 12-18-2000)