(A) On-site inspections shall be conducted by members of the Building Commission and/or its designee to include: Building Commissioner, Building Inspector(s), Town Engineer or others to ensure compliance with all state and local ordinances.
(B) After the issuance of any building permit inspections shall be made that are necessary to ensure full compliance with the provisions of this code and the terms of the permit. Re-inspections of work found to be incomplete or not ready for inspection are subject to assessment of re-inspection fees (of $100) or as prescribed in this code. Prior to the pre-pour foundation walls inspection, a written document signed and sealed by a registered Indiana Land Surveyor must be submitted certifying the top of the footing.
(C) The Building Commission or its designee shall keep all necessary records of inspections and in the event an Inspector believes there to be non-compliance with the permit, the codes or any other applicable rules, regulations or laws, it shall report the same immediately to the Building Commission.
(D) There shall be a minimum of three inspections of all new construction in which the following shall be specifically covered:
(1) Footing locations;
(2) Framing, plumbing and electric; and
(3) Final inspection.
(E) The number of required inspections may be increased or decreased at the discretion of the Building Commission or its designee based on the complexity of the project.
(F) It is the responsibility of the permit holder to provide the Building Commission or its designee with at least 24 hours notice of the request for an inspection.
(G) Final inspection and/or close out of non-occupancy type permits are the responsibility of the permit holder.
(Ord. 2018-02, passed 3-12-18)