(A) Wherever a proposed subdivision lies adjacent to or between other subdivisions which have been provided with sidewalks, and whenever the proposed subdivision will average more than 3-1/2 lots per gross acre included in the subdivision, the Plan Commission shall require sidewalks to be installed on each side of the street.
(B) When sidewalks are required, they shall be constructed of portland cement concrete, at least four inches thick, and four feet wide.
(Ord. passed 3-9-70) Penalty, see § 10.99