§ 51.13 WASTEWATER DISCHARGE DATA DISCLOSURE.
   (A)   General disclosure. All industrial dischargers proposing to connect to or to discharge sewage, industrial wastes and other wastes to the treatment works shall comply with all terms of this chapter within ninety days after the effective date of Ordinance 14-1985.
   (B)   Disclosure forms. Industrial dischargers shall complete and file with the city, a disclosure declaration in the form prescribed by the city, and accompanied by the appropriate fee. Existing industrial dischargers shall file disclosure forms within thirty days after the effective date of Ordinance 14-1985, and proposed new industrial dischargers shall file its disclosure forms at least ninety days prior to connecting to the treatment works. The disclosure to be made by the industrial discharger shall be made on written forms provided by the city and shall cover:
      (1)   Disclosure of name, address, and location of the industrial discharger;
      (2)   Disclosure of Standard Industrial Classification (SIC) number according to the Standard Industrial Classification Manual, Bureau of the Budget, 1972, as amended;
      (3)   Disclosure of wastewater constituents and characteristics including but not limited to those mentioned in this chapter as determined by bona-fide chemical and biological analyses. Sampling and analysis shall be performed in accordance with procedures established by the U.S. EPA and contained in 40 CFR, Part 136, as amended;
      (4)   Disclosure of time and duration of discharges;
      (5)   Disclosure of average daily and instantaneous peak wastewater flow rates, in gallons per day, including daily, monthly and seasonal variations, if any. All flows shall be measured unless other verifiable techniques are approved by the Service Director due to cost of nonfeasibility;
      (6)   Disclosure of site plans, floor plans, mechanical and plumbing plans and details to show all sewers, sewer connections, inspection manholes, sampling chambers and appurtenances by size, location and elevation;
      (7)   Description of activities, facilities and plant processes on she premises including all materials which are or may be discharged to the sewers or works of the city.
      (8)   Disclosure of the nature and concentration of any pollutants or materials prohibited by this chapter in the discharge, together with a statement regarding whether or not compliance is being achieved with the chapter on a consistent basis and if not, whether additional operation and maintenance activities and/or additional pretreatment is required for the industrial discharger to comply with this chapter;
      (9)   Where additional pretreatment and/or operation and maintenance activities will be required to comply with this chapter, the industrial discharger shall provide a declaration of the shortest schedule by which the industrial discharger will provide such additional pretreatment and/or implementation of additional operation and maintenance activities.
         (a)   The schedule shall contain milestone dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the industrial discharger to comply with the requirements of this chapter including, but not limited to, dates relating to hiring an engineer, hiring other appropriate personnel, completing preliminary plans, completing final plans, executing contract for major components, commencing construction, completing construction, and all other acts necessary to achieve compliance with this chapter.
         (b)   Under no circumstances shall the city permit a time increment for any single step directed toward compliance which exceeds nine months.
         (c)   Not later than fourteen days following each milestone date in the schedule and the final date for compliance, the industrial discharger shall submit a progress report to the city, including no less than a statement as to whether or not it complied with the increment of progress represented by that milestone date and, if not, the date on which it expects to comply with this increment of progress, the reason for delay, and the steps being taken by the industrial discharger to return the construction to the approved schedule. In no event shall more than nine months elapse between such progress reports to the city.
      (10)   Disclosure of each product produced by type, amount, process or processes and rate of production;
      (11)   Disclosure of the type and amount of raw materials utilized (average and maximum per day).
      (12)   All disclosure forms shall be signed by a principal executive officer of the industrial discharger, and a licensed professional engineer.
      (13)   All sewers shall have an inspection and sampling manhole or structure with an opening of no less than twenty-four inches diameter and an internal diameter of no less than thirty-six inches containing flow measuring, recording and sampling equipment as required by the city to assure compliance with this chapter.
   The city will evaluate the complete disclosure form and data furnished by the industrial discharger and may require additional information. Within thirty days after full evaluation and acceptance of the date furnished, the city shall notify the industrial discharger of the city's acceptance thereof.
(Ord. 14-1985, passed 3-27-85) Penalty, see § 51.99